TCS Launch Extravaganza!
A brief plan for all the everybodies doing launch things on or about April 3, 2021.
Schedule Outline
Durango Train departs on or about 4pm MST March 31 for Haluapi Mountain Campsite, AZ
At 8 AM PST April 1 the Durango Train departs for Lancaster, CA
Durango Train arrives Lancaster AirBNB ~1PM PST April 1 and begins flight ops preparation
Joe Barnard arrives Thursday-ish to Lancaster AirBNB
Friday April 2 USC provides 1 Hamster unit to Joe for integration for flight
Friday April 2, Extensive ground tests. Weather review. Document and Sim updates. B-roll filming. Head to sleep early
Saturday April 3: Launch Day
Depart Lancaster 5AM PST
Arrive at FAR NLT 7AM PST
Waiver opens at 8AM PST
Sirus off the rail ASAP
60G AVA Flight
Virgo II
Lumineer
Dayna’s flight
Xyla’s flight
Recovery Operations
Optional Telescope viewing session at evening
Sunday April 4 - Backup recovery ops day. Transfer HQ from Lancaster to Irvine
April 5 - April 15 - Work. Screw around. Don’t catch COVID.
April 10, 2021 Launch CTRL+V
April 17, 2021 Backup launchdate
Technical Specifications:
Joe Barnard: Altus Metrum Channel 0, 900 MHz Multiband
Charlie Garcia: Altus Metrum Channel 5 & Channel 6, 900 MHz Multiband
Andrew Adams: Altus Metrum Channel 9
Other FAR users may conflict with this spectrum allocation
FAR Packing List:
Food for 3 meals
Water
Rockets
Rocket tools
Rocket procedures
Drone
Cameras
Joe’s streaming kit